The G-BOM analyzer interface:
2. MANUFACTURING STAGE:
i) Import the name of process; search and enter the process form the GHG emission database; repeat the procedures similarly in previous stage.
Data input examples:
1.Injection molding for 0.685kg HDPE
2.Electricity consumption: Electricity (china average) >> 0.9x0.685= 0.6165kwh
User can proceed to distribution stage after finishing the data entry in manufacturing stage.
BACK | NEXT |
Copyright © 2013 - All Rights Reserved - The Hong Kong Polytechnic University